The Greeneco geothermal power plant project, located within the boundaries of Sarayköy in Denizli Province, has been commissioned in phases.
The first phase began operations in 2016.
Currently, with five generation licenses, it has reached a total generation capacity of 131.8 MWm/129.8 MWe.
Most recently, the JES-7 plant, with an installed capacity of 24.5 MWe, began operations at the end of 2024.
Hybrid solar power plants are in place to contribute to the plants’ internal consumption. It is planned to increase the hybrid installed capacity to 39.9 MW through capacity expansions at the existing plants.