Ege WPP
Ege WPP
Ege WPP project, located within the borders of İzmir province, was commissioned in 2015 following provisional acceptance. The plant consists of 6 turbines with an installed capacity of 15,2 MW and achieves approximately 15.000 tons/year CO2e emission reduction.