Geycek WPP project, located within the borders of Kırşehir province, was commissioned in 2013 following its provisional acceptance. The plant consists of 70 wind turbines, including 60 with a capacity of 2,3 MW and 10 with a capacity of 3 MW. Geycek power plant has the auxiliary SPP source with an installed capacity of 46,6 MW, the total installed capacity of the plant is 214,6 MW. With the completion of two additional turbine investments, the plant is expected to achieve an annual CO2e emission reduction of approximately 310.000 tons.