Göktepe WPP
Göktepe WPP
Göktepe WPP project, located within the borders of Yalova province, was commissioned in 2022 following its provisional acceptance. The plant consists of 29 turbines with an installed capacity of 121,1 MW. It achieves an annual CO2e emission reduction of approximately 215.000 tons. A battery energy storage system with an approximate capacity of 132 MWh has been contracted with Rolls-Royce, and the project development process is ongoing.